05 февруари 2011

DAIKIN FTXS Defrost

FTXS20G2V1B
FTXS25G2V1B
FTXS35G2V1B
FTXS42G2V1B
FTXS50G2V1B

Detail Conditions for Starting Defrost

The starting conditions must be made with the outdoor air temperature and heat exchanger
temperature. Under the conditions that the system is in heating operation, 6 minutes after the
compressor is started and more than 28 minutes (20/25/35 class), 30 minutes (42 class), or 44
minutes (50 class) of accumulated time pass since the start of the operation or ending the
defrosting.

Conditions for Canceling Defrost

The judgment must be made with heat exchanger temperature.
(20/25/35 class : 4°C-22°C, 42 class : 4°C-15°C, 50 class : 4°C-12°C)

Няма коментари:

Публикуване на коментар